Let's Get Started
Fields marked with an * are required
Consult a Professional
Fields marked with an * are required
Client BHI
Location Holden, UT

The construction of a new solar energy farm on 419 acres is taking place in Holden, Utah. CRS setup the control network for the site in advance of the construction staking phase. The staking of the site consisted of approximately 30,000 linear feet of roadway, over 22,000 linear feet of V-shaped drainage ditches with 7 storage ponds, over 90,000 feet of conduit trenching, and 23 power station pad sites. The staking for the entire site was completed in 6 weeks. With construction currently under way, CRS is supporting the effort with minor re-staking trips along with as-built survey services.

Put Our Experience to Work for You. View Our Project Portfolio
Planning a Project? Let's Talk