Water Resources
Miller
Motorsports Park Culinary Water Supply
With Sahara Construction for Larry H. Miller Group
Reuse of
Treated Wastewater Study and Regulatory Approval
Tooele City
Long Range
Water Source Master Plan
Taylorsville-Bennion Improvement District
West
Farmington Culinary Water System Pipeline
Weber Basin Water Conservancy District
Zone B Pumps
and Pipeline in Bluffdale
Jordan Valley Water Conservancy District
Centerville
Waterline Relocation
Weber Basin Water Conservancy District
Old Mill
Golf Course Irrigation System Design
Salt Lake County Parks and Recreation
Groundwater
Modeling and Water Source Management
T
aylorsville
Bennion Improvement District
Water Rights
Protection Strategy
Taylorsville-Bennion Improvement District
Return to top
Site Engineering and Development
Davis High
School Replacement
with VCBO Architects for Davis County School District
Dannon Yogurt
Processing Plant
The Dannon Company Inc.
Ft.
Douglas Armory
with GSBS Architects for the State of Utah DFCM
11 Elementary
Schools, 1 Middle School and 2 High Schools
with VCBO Architects for Box Elder,
Weber, Jordan,
Park City and Davis
County School Districts
Brumback
Land, Davis County Due Diligence Assessment
Brumback Land
Malt-O-Meal Production Plant
with
Professional Design Group for Malt-O-Meal Company
Big
Cottonwood Park
Salt Lake County Parks and Recreation
Capital
Lumber, Salt Lake City Site Facility Design
Capital Lumber Company
Jordan Commons
with FFKR Architects for Larry H. Miller Group
Return to top
Transportation
1-15 North
Commuter Rail Corridor Joint Design Planning Study
with HDR for
UTA/UDOT
Legacy Parkway
Utility Coordination
with Fluor Ames Kramer for UDOT
US-89 Shepard
Lane Design-Build
with Fluor Ames Kramer for
UDOT
3900 South
Pedestrian/Bicycle Bridge
Salt Lake County
Ogden 24
th
Street Beautification and Reconstruction
UDOT
Clark Lane
Widening and Reconstruction Design
Farmington City
US-89 Cherry Hill Interchange, Fruit
Heights
UDOT
SR-108 Environmental Impact
Statement with HDR: Utilities and Right-of-Way
UDOT
East Canyon Guardrail Upgrades
UDOT
Five-way Intersection at State and
Main
Farmington City
Return to top
Railroad Design
100 Mile Rehabilitation Plan of the Nevada Northern Railway,
Wendover to Ely, NV, 2006-2008
US Department of Energy Moab UMTRA Project, 22,400 feet of rail,
Moab, UT, 2007-2009
West Corinne Railroad Design, 42,000 feet of rail, 7 road crossings, wetland delineation,
Corinne, UT, 2008-2009
UPRR Burmester Yard Rehabilitation and Expansion, 20,000 feet of rail,
Grantsville, UT, 2008
Tahoe Reno Industrial Center, Design Review and UPRR Submittal,
28,000 feet of rail, 3 road crossings, 1,000 acres,
Reno, NV, 2007-2009
Green River Refining Railroad Design, 32,000 feet of rail,
Green River, UT, 2008-2009
Alton Coal Transfer Facility Design, 21,100 feet of rail,
Cedar City, UT, 2008
Antelope Valley / AMPAC Rail Served Industrial Parks, 80,000 feet of rail,
3 road crossings, 5,232 Acres,
Cedar City, UT, 2006
Apex 385 Rail Served Industrial Park, Preliminary Master Plan, 24,900 feet of rail, 390 Acres,
Apex, NV, 2007-2008
Anderson Development / Geneva Steel Railroad and Road Crossing Master Plan, 13,800 feet of rail, 14 road crossings,
Vineyard, UT, 2006-2008
Malt-O-Meal Railroad Design, 6,500 feet of rail, 5 road crossings,
Tremonton, UT, 2007
EnergySolutions/Westinghouse Rail Design, 1,100 feet of rail,
Hematite, MO, 2008-2009
Golden Gate Petroleum Railroad and Spill Containment Design, 1,500 feet of rail, spill containment system,
Reno, NV, 2008-2009
Chevron Oil Refinery Railroad Design, 10,600 feet of rail,
Salt Lake City, UT, 2007-2008
Monsanto Company, 6, 320 feet of rail, 1 private at-grade railroad crossing,
Soda Springs, ID, 2010
Washakie Renewable Energy Ethanol Facility Design, 2,200 feet of track,
Plymouth, UT 2010
Return to top
Pavement Management
Intermodal and
Automotive Yard Pavement Management, Nationwide
Union Pacific Railroad
City-wide Road
Paving Projects 1996-2006
Farmington City
Various School
Parking Lots
Jordan, Salt Lake, and Park City
School Districts
East Canyon
Relief Trunkline Replacement, Pavement/Trail Restoration
Snyderville Basin
Water Reclamation District
Pavement
Management
Midvale City
Pavement Management
Utah
State DFCM
Return to top
Land Surveying
I-15 Nephi
Area Freeway Reconstruction Survey
with
Wadsworth Brothers
Construction for UDOT
1-15
Construction Staking in Salt Lake County and Utah County
UDOT
State Road
108, Ogden Airport to Antelope Dr., Clearfield
UDOT
Snyderville
Basin Topographic Control
Snyderville Basin Water
Reclamation District
North Light
Rail Corridor Study Control and Right of Way
UDOT-UTA
2005-2006 ALTA
Surveys
Jordan School District
Hogle Zoo
Elephant Exhibit
Hogle Zoo
2002 Winter
Olympic Village Housing
with
Bud Bailey (Swinerton Wahlberg) Construction for the University of
Utah
Utah Olympic
Park at Bear Hollow Bobsled/Luge Venue
with Okland Construction for
Summit County
Surveying Services for Capital Improvement Projects
City of West Jordan
Utah Olympic
Oval
with
GSBS Architects for Salt Lake County
Return to top
Geographic Information Systems
Stream Channel Mapping on Farmington Creek
Farmington City
GIS Mapping,
Asset Management and GPS Survey
Union Pacific Railroad
GIS Mapping
and GPS Survey
Roy Water Conservancy
Sub-district
GIS System
Gorgoza Mutual Water Company
SunCrest Development GIS Application for Document Management, Information
Sharing and Construction Inspection
SunCrest, L.L.C.
GIS
Applications for Water Rights and Subsurface Water Quality Study
Taylorsville-Bennion Improvement
District
GIS System
Pine View Water
GIS System
Midvale City
Return to top
Waste Water
East Canyon
Relief Trunkline Replacement
Snyderville Basin Water
Reclamation District
Shepard Lane
Trunkline Relocation
with Fluor Ames Kramer for
Central Davis Sewer District
Trunkline Replacement-North Salt Lake / Woodscross, Related to Legacy Parkway
South Davis Sewer District
West
Farmington Trunkline Replacement
Central Davis Sewer District
Construction
Management Services for Salt Lake City Raw Sewage Force Main
with Boyle Engineering for Salt
Lake City Public Works
Ongoing
Wastewater Line Projects
Taylorsville-Bennion Improvement
District
Sewer
Trunkline Relocation for Legacy Parkway in West Farmington
Central Davis Sewer District
US-89
Burke Lane Sewer Relocation
with Fluor Ames Kramer for
Central Davis Sewer District
Return to top
Storm Water
East Canyon
Secondary Waterline
Snyderville Basin Water
Reclamation District
SunCrest Development Storm Drain and Hydrologic Studie
s
SunCrest L.L.C.
East and West
Farmington Storm Drainage Master Plans
Farmington City
Master Storm
Drain Plan and Facility Plan
Bluffdale City
FEMA Flood
Plain Study
Draper City
Storm Drainage
Master Plan
Fort Douglas
Storm
Drainage Master Plan
Midvale City
Big
Cottonwood Creek Detention Basin
Salt Lake County
Return to top
Wetlands/Environmental
East Canyon
Creek Water Augmentation Study
Snyderville Basin Water
Reclamation District
Legacy
Parkway, Weber Basin Water Transmission Line Relocation
Weber Basin Water conservancy
District
River Bend
Golf Course
Salt Lake County
Parks and Recreation
Jordan River
Parkway 21
st
South to 7200 South
Salt Lake County Parks and
Recreation
Creekside Park
Salt Lake County Parks and
Recreation
5600 West
Water Transmission Line
Jordan Valley Water conservancy
District
Tooele
Municipal Golf Course;
Tooele City
Fairfield
Junior High School Wetland Mitigation
;
Davis County School District
Legacy
Parkway Projects
Weber Basin Water Conservancy
District
Return to top
Current Projects
Utility
Oversight Coordination for the Legacy Parkway
UDOT
Monticello
Water System and Spring Collection System Restoration
Monticello City
Park City High
School Replacement
with VCBO Architects for Park
City School District
Software
Support Facility
with Okland Construction for Hill
Air Force Base
Streets
and Fleets
with GSBS Architects for Salt
Lake City Corporation
North Salt
Lake Armory
with GSBS for Utah Sate DFCM
SunCrest
Development Storm Drain System Design and Erosion Control
SunCrest, L.L.C.
4 Million
Gallon Culinary Water Reservoir, Airport #2 Site
City of West Jordan
Parkway Blvd.
Sewer Trunkline Replacement
Granger Hunter Improvement
District
Sewer Pipeline
Design Services Associated with the Legacy Parkway Project
South Davis Sewer District
Geneva Steel
Site Rail Design
Anderson Development
Handicap
Access (ADA) Ramps at Intersections City-wide
Farmington
1075 West Intersection Improvements
Farmington City / UDOT
400 West Pedestrian Trail
Underpass
Farmington City / UDOT
Station
Park Road Access to Farmington Commuter Rail Station
Farmington City / UDOT
Clearfield Canal Trail Phase I and Phase II
Clearfield City Corporation and UDOT
US-89: Orchard Drive, North Salt
Lake to I-15 Bountiful Pavement Rehabilitation
UDOT
Parish Lane Interchange Widening:
Construction Management
UDOT
1300 West, 3300 South to 3400
South Sewer Replacement
Granger Hunter
Improvement District
Syracuse Elementary School #57
with
Naylor Wentworth Lund Architects for Davis School District
Heartland Elementary School Replacement
with VCBO Architects for Jordan School District
Morgan Elementary School Addition
with VCBO Architects for Morgan School District
Morgan High School Addition
with VCBO Architects for Morgan School District
Mt.
Green Elementary School
with VCBO Architects for Morgan School District
Welby
Elementary School Parking Lot Addition
Jordan School District
Westvale Elementary School Parking Lot Addition
Jordan School District
Kyle Canyon Hydrology Study and Flood Plain Model
With Case Lowe & Hart for the US Forest Service, Humboldt-Toiyabe
National Forest
Pages Lane
Storm Drain Design
West Bountiful City
1100 West Waterline Replacement
West Bountiful City
Storm Drain Master Plan
Farmington City
Return to top