CRS was selected to design and manage the construction of 6,200 LF of 27” and 24” sewer lines for the Granger-Hunter Improvement District. The design and construction included 21-foot deep sewer in a tight 25’ to 30’ right-of-way throughout most of the project. This 6,200 foot sewer line project included a 400’ foot boring crossing under I-215 plus five additional 100’ long borings to construct the sewer near high voltage transmission power lattice towers and a crossing of the Chesterfield drain culvert in 2700 West Street.
Granger Hunter Improvement District
West Valley, UT